Post-construction & handover cleaning

Construction cleaning, done properly

Not a general tidy-up — construction cleaning. Dust, debris, overspray and residue cleared once trades are through, so a site is genuinely ready for what's next.

Builders, renovators and trades: coordinated around site access, not a fixed roster.

Two moments matter most — straight after the trades finish, and right before the keys change hands. Both are covered below.

What's on offer

Services

Two passes, one standard — ready for whoever walks through next.

Construction Cleaning

Quoted per site
Builder's Clean 01

Post-Construction Clean

The first full clean once trades are out — before fit-off and final finishes go in.

  • Dust & debris removal, floor to ceiling
  • Overspray & adhesive residue removal
  • Window & frame tracks cleaned
  • Benches, fixtures & fittings wiped down
  • Site left safe and workable for the next trade
Final Pass 02

Final Handover Clean

The last clean before keys change hands — presentation-ready for the walkthrough or inspection.

  • Full detail clean, top to bottom
  • Kitchens & bathrooms to move-in standard
  • Glass, mirrors & fixtures polished
  • Floors vacuumed, mopped & spot-checked
  • Ready for the walkthrough, on your timeline

Every job is quoted after a quick look at the site or plans.

How it works

Booking a clean

01

Get in touch

Send through the site address, stage of build, and your target handover date.

02

We scope it

A quick look at the space or plans, and you'll have a quote back fast.

03

Ready on time

Cleaned and presentation-ready before your walkthrough or key handover.

Get in touch

Enquire about a clean

Tell me about the site and the timeline — I'll come back with a quote.

Copies your details, then opens a DM with @en.point.au.